Timeline

Our Environmental Investments Over the Past Years

2023

Expansion of the photovoltaic system

Increase in output from 90 kWp to 170 kWp

2021

Laboratory ventilation with heat recovery

Commissioning of the new laboratory ventilation with heat recovery of the excess drying waste heat

Energy storage for laboratory ventilation and building heating

CO₂ reduction potential of approx. 100 tonnes/year

2020

Investment in a photovoltaic system

Production of solar power for own use

Parking spaces for e-cars with charging station

In the future, the company will switch from diesel-powered vehicles to electric vehicles.

New laboratory chapels

Investment in new laboratory chapels with up to 30% less consumption of conditioned air

2019

Thermal insulation of the roof surfaces and replacement of the roof panels

Preparation for the installation of the photovoltaic system

 

2018

Investment in building surveillance

Fire and environmental risks are to be further minimised

Acquisition of new transport vehicles

In order to carry out intra-plant transports even more efficiently and ecologically

g
2017

Switching to eco heating oil despite additional costs

Fuel oil ÖKO < 50 ppm sulphur content

2016

Extension of the new external warehouse

As a result, the number of trips to the external camp could be further reduced

2014

LED illuminants

All luminaires in the building were replaced with LED luminaires

2013

Reuse of the waste product

Registration and obtaining a licence to place fertilisers on the market

2012

New windows

New windows with better thermal insulation were installed in the whole building

2008

Certification according to environmental standard ISO 14001

New tank system

Investment in new tank facility, which halved the factory traffic of tank trucks

i
2003

Certification according to ISO 9001